Paste text below
Text entered
M25 Junction 27, Essex: clockwise carriageway closed overnight for resurfacing
Government Communications (NDS)
24 October 2011
The clockwise carriageway will be closed between 10pm and 5.30am for the work to be carried out. The northbound link road from the M11 to the M25 clockwise will also be closed during this time.Paul Robinson, Highways Agency Asset Manager, said:“The resurfacing will improve the condition of the carriageway and reduce the need for unplanned maintenance closures in the future. The work has been carefully planned to minimise disruption and so is being carried out overnight when traffic flows are lowest.”A clearly signed diversion route will be in place during both closures. Road users will be diverted off the M25 clockwise carriageway on to the M11 northbound to junction 7, to return on the M11 southbound carriageway and rejoin the M25 clockwise via the M11 link road to the M25.Ends
Text entered is not saved. Save now
Save above text so that it can be shared and viewed side-by-side with news articles
- Teenage boy raped, Sunderland
- 57 jobs at new Sainsbury's ...
- Adonia Legtone
- London 2012 Olympic Games ...
- Child grooming "Scotland must ...
- Family tribute to Morpeth road ...
- University of Leicester - Simple ...
- New recommendations on the ...
- West Midlands Motorway And Trunk ...
- Sainsbury's own label wines ...
| 5 news articles similar to text entered | Visualisation | Side-by-side | ||||
|---|---|---|---|---|---|---|
| , |
cut |
pasted |
characters |
|||
Loading news articles
Text entered
M25 Junction 27, Essex: clockwise carriageway closed overnight for resurfacing
Government Communications (NDS)
24th October 2011
The clockwise carriageway will be closed between 10pm and 5.30am for the work to be carried out. The northbound link road from the M11 to the M25 clockwise will also be closed during this time.Paul Robinson, Highways Agency Asset Manager, said:“The resurfacing will improve the condition of the carriageway and reduce the need for unplanned maintenance closures in the future. The work has been carefully planned to minimise disruption and so is being carried out overnight when traffic flows are lowest.”A clearly signed diversion route will be in place during both closures. Road users will be diverted off the M25 clockwise carriageway on to the M11 northbound to junction 7, to return on the M11 southbound carriageway and rejoin the M25 clockwise via the M11 link road to the M25.Ends
Churn statistics
cut
pasted
characters overlap